Stage 1: Enquiry received
- We confirm the full requirements of your plant, including output rates
- We raise your quotation
- We provide plans of the proposed plant on your site plans
- We supply you with a programme of works.
Stage 2: Order placed
- We provide plant loadings and layout drawings, and supply foundation bolts
- We provide general arrangement drawings and confirm final details
- The plant goes into production
- We arrange visits to our works so you can track progress
- We provide health & safety files for site approval
- A final inspection takes place at our works before delivery of components to site.
Stage 3: Delivery to site
- We set up the site for the plant build, including the site office and welfare facilities, and carry out site inductions
- We deliver the plant to the site and install the mechanical and electrical components
- We hold weekly site meetings with you to solve any problems
- We carry out pre-safety inspections prior to running checks on the plant
- We commission the plant and carry out trial loads
- A full plant inspection is carried out, including safety checks, before we hand the plant over
- For 12 months we make regular inspections to monitor the plant’s operation and production rates.